When the grid fails, the generator decides whether a facility keeps running. A set that is too small trips on overload or stalls when a large motor starts. A set that is far too large wastes capital and fuel, and runs lightly loaded, which carbon-fouls the engine and shortens its life. Both mistakes are common, and both come from skipping the sizing calculation.
Sizing a generator is not just adding up kilowatts. Power factor, motor starting, non-linear loads such as UPS systems and VFDs, site temperature and the duty the set is expected to perform all change the answer. Pakistan adds its own conditions: hot summers, dusty air, frequent grid interruptions and long running hours for some users.
This guide explains the ISO 8528 rating classes, a step-by-step sizing method with a worked example, derating for Pakistani conditions and how the generator integrates with the rest of the electrical system. It is written by the engineering team at Bilal Switchgear Engineering, which designs the switchgear and control panels around generator installations.
Generator Ratings: ESP, PRP, COP and LTP
A set’s kVA rating means nothing until you know under which duty it applies. ISO 8528 defines the standard rating classes, and a supplier’s catalogue should state which one is quoted.
Standby Power (ESP)
Standby or emergency rating applies to sets that run only during mains failure, with the annual running hours limited by the manufacturer. It gives the highest kVA figure and suits hospitals, buildings and facilities that depend on the grid most of the time.
Prime Power (PRP)
Prime rating is for sets that run for long periods with a variable load. It carries a lower kVA than the standby rating on the same engine. Where load shedding is long or frequent, so the set acts as a main source, prime rating is the safer basis.
Continuous Power (COP) and Limited-Time Power (LTP)
Continuous rating is for sets running at constant load without time limit, such as an island power station. Limited-time rating applies to short-duty operation, such as peak lopping or parallel running with the grid. Selecting a set on its standby kVA but using it as a prime source is a frequent and costly mistake.
How to Size a Generator Step by Step
Step 1: List the Loads to Be Supplied
Decide which loads the generator must carry: whole facility, essential services only or a defined process. Record running kW, power factor and the starting method of each motor.
Step 2: Convert to kVA
Divide running kW by power factor to get kVA. Then add the loads together using realistic diversity, because not everything runs at once.
Step 3: Allow a Loading Margin
Do not size the set to run at 100 percent. Choosing a rating so that the expected running load is about 70 to 80 percent leaves room for load growth and transient peaks.
Step 4: Check Motor Starting
Large motors draw several times their running current at start, which causes the generator voltage and frequency to dip. The set must recover without stalling or tripping other equipment.
Worked example: a facility has a running load of 250 kW at 0.85 power factor, which is 250 / 0.85 = 294 kVA. Aiming for about 80 percent loading gives 294 / 0.8 = 368 kVA, so a 400 kVA set (320 kW at 0.8 power factor) is the first candidate. The largest motor is 75 kW, with 93 percent efficiency and 0.88 power factor, so its running kVA is 75 / (0.93 x 0.88) = about 92 kVA. Started direct on-line at 6 times, it draws about 550 kVA, which is 1.4 times the set rating. With star-delta starting, this falls to about 183 kVA, which is under half the set rating. The practical conclusion is that a star-delta or soft starter can avoid a larger set, and the final check should be run in the supplier’s motor starting software against the allowed voltage dip.
Step 5: Account for Non-Linear Loads
UPS rectifiers and VFDs draw distorted current, which heats the alternator and distorts its voltage. The alternator often needs to be larger than the load kVA would suggest, with the multiple depending on the rectifier type and filtering. Always request the manufacturer’s recommendation for the actual load, especially where a large industrial UPS system is involved.
Derating for Pakistani Site Conditions
Generator catalogue ratings assume ISO 3046-1 reference conditions of 25 degrees Celsius, 100 kPa and 30 percent relative humidity. Real Pakistani sites are different. Summer ambient temperatures of 45 degrees Celsius or more, altitude in northern regions and dust-clogged filters all reduce the power an engine can deliver, and hot air also reduces cooling margin and alternator output.
Engine and alternator manufacturers publish derating tables for temperature and altitude. Apply them to the specific model and do not use a generic percentage. If the site conditions require derating, either select a larger set or improve the conditions, for example by providing cooler intake air to the generator room.
Fuel Consumption and Tank Sizing
A diesel generator uses roughly 0.25 to 0.30 litres of fuel per kWh of output at good loading, and consumption per kWh rises at low load. Fuel storage should be sized from the actual running load and the required autonomy.
Fuel example: the 400 kVA set above carries 250 kW. At about 0.26 litres per kWh, it burns around 65 litres per hour. For 8 hours of autonomy, the tank must hold at least 520 litres of usable fuel, plus an allowance for unusable volume and a reserve. Facilities that expect long outages, such as hospitals, normally keep much more, with a day tank and a main storage tank.
Generator Room, Ventilation and Noise
- Combustion and cooling air: the room must supply enough clean air for combustion and radiator cooling, and carry hot air away. Poor ventilation is a leading cause of overheating shutdowns
- Exhaust: route and insulate exhaust pipework, size it to limit backpressure and discharge it away from air intakes and occupied areas
- Noise: acoustic canopies or room attenuation are needed near occupied buildings, and local environmental limits may apply
- Foundation and vibration: use a level plinth with anti-vibration mounts and flexible connections for exhaust, fuel and cables
- Fuel safety: bunding, spill containment and fire protection for the fuel store and generator room
Electrical Integration: AMF, UPS and Earthing
A generator only helps if the changeover works. ATS and AMF panels detect the mains failure, start the set, confirm stable voltage and frequency and transfer the load. Standards such as NFPA 110 define a Type 10 emergency system as one that accepts load within 10 seconds, which is a useful benchmark for critical facilities.
- UPS bridging: a UPS covers the gap between mains failure and generator readiness for sensitive loads
- Neutral and earthing: the generator neutral arrangement and the use of 3-pole or 4-pole transfer switching must be coordinated with the supply earthing system
- Load shedding: non-essential loads can be shed automatically during generator operation to protect the set from overload
- Paralleling: multiple sets can share load through a synchronising panel, giving flexibility and redundancy
- Anti-islanding: generators that could feed back into the DISCO network must be interlocked with the incomer
Testing and Maintenance
A generator that has not been run under load cannot be trusted. NFPA 110 recommends a monthly test of at least 30 minutes on load, and many facilities add a periodic load bank test to prove the set can deliver its rated output. Keep records of oil and coolant condition, battery health, fuel quality and filter changes. Fuel degrades in storage, so sample and treat it regularly.
Common Generator Sizing Errors
- Adding kW and forgetting power factor, so the kVA is under-sized
- Choosing a set by its standby rating while using it as a prime source
- Ignoring motor starting, so the set stalls or the voltage dips and contactors drop out
- Ignoring UPS and VFD harmonics when selecting the alternator
- Oversizing so far that the set runs below 30 percent load for most of its life
- Skipping site derating for Pakistani summer temperatures
Generator System Integration by Bilal Switchgear Engineering
Bilal Switchgear Engineering designs the electrical systems around generators. Our Power Division builds AMF and ATS panels, synchronising and distribution switchgear, and our MEP project services cover installation, cabling, earthing and commissioning. We can review your load list and starting methods before you select a generator.
Contact our engineering team to discuss generator integration or to have a sizing calculation checked.
Frequently Asked Questions
How do I calculate the generator kVA I need?
Add the running kW of the loads to be supplied, divide by the power factor to get kVA, apply realistic diversity and then choose a rating so the running load is about 70 to 80 percent of the set. Finally check motor starting and any non-linear loads against the manufacturer’s data. For example, 250 kW at 0.85 power factor is 294 kVA, and a 400 kVA set gives about 74 percent loading.
What is the difference between standby and prime power ratings?
Under ISO 8528, a standby (ESP) rating applies to sets that run only during mains failure for limited hours and gives the highest kVA. A prime (PRP) rating is for long or frequent running with a variable load and is lower on the same engine. If outages are long or frequent, size on the prime rating.
Why does my generator struggle when a large motor starts?
A direct on-line motor draws about 5 to 7 times its full-load current at start, which can cause a large voltage and frequency dip. Using star-delta, soft starters or VFDs lowers the starting kVA. The set should be checked against the permitted voltage dip, commonly 15 to 20 percent, using the supplier’s motor starting calculation.
How much fuel does a diesel generator use?
Roughly 0.25 to 0.30 litres per kWh of electrical output at good loading, so a set carrying 250 kW uses about 65 litres per hour. Consumption per kWh rises when the set runs lightly loaded, which is another reason not to oversize.
Does high temperature in Pakistan reduce generator output?
Yes. Catalogue ratings assume 25 degrees Celsius at ISO 3046-1 reference conditions, while many Pakistani sites exceed 45 degrees in summer. Use the manufacturer’s derating tables for the specific engine and alternator, and either select a larger set or improve the ventilation and cooling of the generator room.